But with such an approach, we missed discovering an essential fact – that the existing piping wasn’t quite square, but rather two degrees off. Previously, our engineers used a tape measure, level, square, and string to measure the existing installation, and then designed an updated replacement. But this seemingly ordinary project could have gone seriously sideways if not for the help of some new technologies. An antiquated strainer on a 16-inch line needed to be replaced, and then the line could be returned to service. On the surface, the pipeline station refit project seemed pretty standard. Learn about new improvements in 3D technologies that take accuracy to a new level. Accurate fit up of replacement piping, equipment, and other components helps minimize downtime.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |